MECC Playground is Complete

We are incredibly grateful for our new playground! For many years, the MECC (old CPE) playground had rain drainage issues, making it impossible for students to use it after heavy rain. The new playground project consisted of more than only adding new equipment; the ground also needed to be regraded to fix these issues. Once the water drainage issues were fixed, our new playground was installed.

We thank everyone on this list for making this project a reality:

Businesses & Locals:
• Ash Recreation & Design, LLC
• Miracle Recreation Equipment Company
• Ozark Mountain Installations
• PlayPower Inc.
• RE Smith
• SAPP Design

District:
• Monett Board of Education
• Dr. Drake
• Mr. Garner
• Mr. Bryan and the Maint. Team
• Summer Work Crew